Home »
Java »
Java Reference »
Java LocalDate Class
Java LocalDate Class | plusMonths() Method with Example
LocalDate Class plusMonths() method: Here, we are going to learn about the plusMonths() method of LocalDate Class with its syntax and example.
Submitted by Preeti Jain, on May 31, 2020
LocalDate Class plusMonths() method
- plusMonths() method is available in java.time package.
- plusMonths() method is used to add the given duration in months to this LocalDate and return the LocalDate.
- plusMonths() method is a non-static method, it is accessible with the class object only and if we try to access the method with the class name then we will get an error.
- plusMonths() method may throw an exception at the time of performing addition.
DateTimeException: This exception may throw when the calculated results exceed the length of this LocalDate.
Syntax:
public LocalDate plusMonths(long mon_val);
Parameter(s):
- long mon_val – represents the month value to add to this LocalDate.
Return value:
The return type of this method is LocalDate, it returns the LocalDate that holds the value added the given months to this LocalDate.
Example:
// Java program to demonstrate the example
// of plusMonths(long mon_val) method of LocalDate
import java.time.*;
public class PlusMonthsOfLocalDate {
public static void main(String args[]) {
long months = 5;
// Instantiates two LocalDate
LocalDate l_da1 = LocalDate.parse("2007-04-04");
LocalDate l_da2 = LocalDate.of(2008, Month.FEBRUARY, 06);
// Display l_da1,l_da2 and months
System.out.println("LocalDate l_da1,l_da2 : ");
System.out.println("l_da1: " + l_da1);
System.out.println("l_da2: " + l_da2);
System.out.println("months to add: " + months);
System.out.println();
// Here, this method adds the given
// months to this date l_da1
// i.e. here we are adding 5
// months to the date l_da1
LocalDate plus_mon = l_da1.plusMonths(months);
// Display plus_mon
System.out.println("l_da1.plusMonths(months): " + plus_mon);
// Here, this method adds the given
// months to this date l_da2
// i.e. here we are adding 5
// months to the date l_da2
plus_mon = l_da2.plusMonths(months);
// Display plus_mon
System.out.println("l_da2.plusMonths(months): " + plus_mon);
}
}
Output
LocalDate l_da1,l_da2 :
l_da1: 2007-04-04
l_da2: 2008-02-06
months to add: 5
l_da1.plusMonths(months): 2007-09-04
l_da2.plusMonths(months): 2008-07-06