Home »
Java »
Java Reference »
Java LocalDate Class
Java LocalDate Class | plusWeeks() Method with Example
LocalDate Class plusWeeks() method: Here, we are going to learn about the plusWeeks() method of LocalDate Class with its syntax and example.
Submitted by Preeti Jain, on May 31, 2020
LocalDate Class plusWeeks() method
- plusWeeks() method is available in java.time package.
- plusWeeks() method is used to add the given duration in weeks to this LocalDate and return the LocalDate.
- plusWeeks() method is a non-static method, it is accessible with the class object only and if we try to access the method with the class name then we will get an error.
- plusWeeks() method may throw an exception at the time of performing addition.
DateTimeException: This exception may throw when the calculated results exceed the length of this LocalDate.
Syntax:
public LocalDate plusWeeks(long weeks_val);
Parameter(s):
- long weeks_val – represents the weeks value to add to this LocalDate.
Return value:
The return type of this method is LocalDate, it returns the LocalDate that holds the value added the given weeks to this LocalDate.
Example:
// Java program to demonstrate the example
// of plusWeeks(long weeks_val) method of LocalDate
import java.time.*;
public class PlusWeeksOfLocalDate {
public static void main(String args[]) {
long weeks = 4;
// Instantiates two LocalDate
LocalDate l_da1 = LocalDate.parse("2007-04-04");
LocalDate l_da2 = LocalDate.of(2008, Month.FEBRUARY, 06);
// Display l_da1,l_da2 and weeks
System.out.println("LocalDate l_da1,l_da2 : ");
System.out.println("l_da1: " + l_da1);
System.out.println("l_da2: " + l_da2);
System.out.println("weeks to add: " + weeks);
System.out.println();
// Here, this method adds the
// given weeks to this date l_da1
// i.e. here we are adding 4
// weeks to the date l_da1
LocalDate plus_weeks = l_da1.plusWeeks(weeks);
// Display plus_weeks
System.out.println("l_da1.plusWeeks(weeks): " + plus_weeks);
// Here, this method adds the
// given weeks to this date l_da2
// i.e. here we are adding 4
// weeks to the date l_da2
plus_weeks = l_da2.plusWeeks(weeks);
// Display plus_weeks
System.out.println("l_da2.plusWeeks(weeks): " + plus_weeks);
}
}
Output
LocalDate l_da1,l_da2 :
l_da1: 2007-04-04
l_da2: 2008-02-06
weeks to add: 4
l_da1.plusWeeks(weeks): 2007-05-02
l_da2.plusWeeks(weeks): 2008-03-05